Concrete footing calculator

A footing is a long box: length × width × depth. 40 ft of 16 × 8 in footing needs about 1.38 cubic yards of concrete including 5% extra.

1.38 cubic yards
40 ft of 16 in × 8 in footing
37.3Cubic feet
0.93 cu ftPer linear foot
6380 lb (36 kg) bags
8360 lb (27 kg) bags
12540 lb (18 kg) bags

How it works

cubic feet = length (ft) × width (in) ÷ 12 × depth (in) ÷ 12; cubic yards = cubic feet ÷ 27

Add up the total run of footing (all sides of the foundation). Footing size depends on soil, load and frost depth, which your local code and plans specify; this calculator only turns those dimensions into a volume.

Concrete per foot and per 100 ft of footing

Footing (W × D)Cu ft per ftCu yd per 100 ft80 lb bags per 100 ft
12 × 6 in0.51.8584
16 × 8 in0.8893.29149
20 × 10 in1.3895.14232
24 × 12 in27.41334

These are estimates for planning and shopping. Buy 5–10% extra, check product labels for actual coverage, and follow local building codes.

Frequently asked questions

How much concrete for 100 ft of 16×8 footing?
100 × 1.333 × 0.667 = 88.9 cu ft, about 3.3 cubic yards before waste.
How deep should a footing be?
It depends on frost depth, soil and load. Local building codes set the minimum; check with your building department.