Concrete for a 18×30 slab, 5 inches thick

A 18×30 ft slab 5 inches thick holds 8.33 cubic yards (225 cu ft, 6.37 m³). That is 375 bags of 80 lb concrete or 500 bags of 60 lb before waste.

8.33 cubic yards
225 cu ft · 540 sq ft at 5 in
225Cubic feet
6.37Cubic meters
37580 lb (36 kg) bags
50060 lb (27 kg) bags
75040 lb (18 kg) bags

18×30 ft × 5 in = 8.33 cu yd → order about 9.17 cu yd with 10% extra

Step by step

Same slab at other thicknesses

ThicknessCu ftCu ydCu yd +10%80 lb bags60 lb bags
3.5 in157.55.836.42263350
4 in1806.677.33300400
5 in2258.339.17375500
6 in2701011450600
8 in36013.3314.67600800

At 9.17 cu yd with waste, ordering ready-mix by truck is usually easier than mixing 413 bags by hand; ask your supplier about minimum loads.

Base, forms and reinforcement

ItemQuantity
Gravel base, 4 in compacted6.67 cu yd (≈9.3 tons)
Form boards (perimeter)96 linear ft of 2×6
Wire mesh, 5×10 ft sheets12 sheets
Control joints (typical spacing ≈ 2–3 × thickness in ft)about every 13 ft

Nearby slab sizes

These are estimates for planning and shopping. Buy 5–10% extra, check product labels for actual coverage, and follow local building codes.

Frequently asked questions

How many bags of concrete for a 18×30 slab 5 inches thick?
375 bags of 80 lb (0.6 cu ft each) or 500 bags of 60 lb, before adding 5–10% extra.
How many yards of concrete for a 18×30 slab?
6.67 cu yd at 4 in, 10 cu yd at 6 in.